22/02/2014
Power-Floating the Slab

Once the concrete has begun to go off (in this case about 14 hours from pour) the concrete is pan-floated to bring air and water to the surface. As the concrete hardens the pan comes off and the blades buff the concrete to a shine.

Pan-floating starts at first light:

Goto Top